CDOTs scheduled lane closures for the week of January 26th

I 70 Eastbound/Westbound through and near the Eisenhower Tunnel (Milemarker 213-216)
(through March 2014)
6:00 PM-6:00 AM SU-SA Single lane closures for routine maintenance including sweeping. Delays possible.

I 70 Westbound/Eastbound In Idaho Springs (Milemarker 242-239) (through February 2014)
7:00 PM-5:00 AM MO-WE All lanes closed WB I-70 for geotechnical drilling. Traffic detoured on Colorado Blvd
thru Idaho Springs. Speed limit reduced to 40 mph through the work zone.

US 160 Eastbound/Westbound West Side of Pagosa Springs (Milemarker 140-142.5) (through
January 2014)
9:00 AM-4:00 PM MO-FR There will be one lane alternating traffic for crack sealing operations. Delays possible.

US 160 Westbound/Eastbound in Mancos (Milemarker 55-57) (through February 2014)
9:00 AM-3:00 PM MO-FR There will be one lane alternating traffic for crack seal operations. 10 minute delays
possible.

US 34 Eastbound/Westbound at Idlewild Lane near Drake (Milemarker 78) (through February
2014)
9:00 PM-3:00 AM WE All lanes closed in both directions on US 34 for bridge repairs over the Big Thompson River near Drake. Alternate routes strongly advised.

US 36 Eastbound/Westbound Between Lyons and Estes Park (Milemarker 4-20) (through May
2014)
24 Hours- There will be one lane alternating traffic north of Pinewood Spgs and south of Estes Park at milepost 7.7
for emergency road repairs. 20 minute delays are possible.
24 Hours- MO-FR, 8:00 AM-4:00 PM SA 24/7 at mileposts 108-125 near Pinewood Springs and mileposts 15.5-18
on the east end of the canyon for canyon wall stabilization and river channel stabilization with possible blasting
operations. MO-FR, 6a-8p & 4p-6p, 10 minute traffic stops; MO-FR 8a-4p, 1 hr traffic stops; MO-FR 6p-6a & SA
8a-4p, 30 minute traffic stops; WE, 9a-noon, 3 hr traffic stop between Estes and Pinewood Spgs.
Visit cotrip.org or coloradodot.info/projects/floodrelatedprojects/us-36-lyons-to-estes for changes or updates
to this report. SH 7 is the alternate route from Lyons with a 20 minute addition to your normal drive time.

US 40 Westbound Near Berthoud Pass (Milemarker 247) (through February 2014)
7:00 AM-5:00 PM TH Right lane closed for wire replacement. Delays possible.

US 50 Eastbound/Westbound East of Cimarron West of Blue Mesa (Milemarker 117-121)
(through June 2014)
7:00 AM-5:00 PM MO-FR There will be one lane alternating traffic for embankment, fence, and culvert work. 15
minute delays. Project hotline: 970-560-2062.

US 550 Northbound/Southbound over Red Mountain Pass (Milemarker 92-87) (through
February 2014)
24 Hours- There will be one lane alternating traffic All lanes closed due to continuous rockfall between Ouray and Ironton Park. Alt routes: From Ouray to Durango (a distance of 70 miles using US 550) motorists will instead use SH 62 from Ridgway over Dallas Divide, SH 145 over Lizard Head Pass, then US 160, for a trip of 168 miles
(a 98-mile detour).

US 6 Eastbound West of US 6/CO 119 (Milemarker 260) (through June 2015)
7:00 AM-4:00 PM MO-FR Right turn lane closed from EB US 6 at CO 119 for construction access. Delays possible.

CO 119 Northbound/Southbound North of US 6/CO 119 Junction (Milemarker 1.5-7) (through
February 2014)
8:00 AM-5:00 PM MO-FR There will be one lane alternating traffic for sanitary sewer manhole rehabilitation by Black Hawk/Central City Sanitation Dist. Delays possible.

CO 119 Northbound/Southbound in Longmont (Milemarker 57-63) (through April 2014)
7:30 AM-4:00 PM MO-FR There will be one lane alternating traffic mileposts 57-59 and 61-63 for bridge deck repairs.
10 minute delays possible.

CO 14 Eastbound/Westbound through Poudre Canyon Between Cameron Pass and Ted’s
Place (Milemarker 106.24) (through January 2014)
24 Hours- There will be one lane alternating traffic with temporary traffic signals or flaggers at various locations 24 hours for culvert replacement and emergency flood repairs. Flaggers will assist with traffic during daytime hours.
10 minute delays at each location.

CO 141 Northbound/Southbound North of Egnar (Milemarker 12-16) (through February 2014)
10:00 AM-4:00 PM TU There will be one lane alternating traffic for asphalt patching. Delays possible.

CO 145 Northbound/Southbound South of Rico to Placerville (Milemarker 59-80) (through
February 2014)
8:00 AM-4:00 PM TU-FR There will be one lane alternating traffic for shoulder cleaning and delineation repair.
Minimal delays.

CO 145 Northbound/Southbound South of Naturita and CO 141 (Milemarker 114-119)
(through February 2014)
8:00 AM-3:00 PM MO-TH There will be one lane alternating traffic for shoulder work. Delays possible.

CO 41 Northbound/Southbound North of US 160 Junction (Milemarker 3.8-5.8) (through
February 2014)
10:00 AM-3:00 PM MO-TH There will be one lane alternating traffic for crack sealing operations. 10 minute delays.

CO 90 Eastbound/Westbound Between Nucla and Paradox (Milemarker 15) (through January
2014)
8:00 AM-3:00 PM MO-FR There will be one lane alternating traffic for crack sealing operations. Delays possible.

This entry was posted in Roads. Bookmark the permalink.